* Today:
+
 
  
 
* 9:30 am Empty target, then start production
 
* 9:30 am Empty target, then start production
 
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)

Revision as of 08:27, 3 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Wednesday, November 3

Past 24 hours

  • Maintenance day. Got Beam Back in the Swing shift.
  • Harp scans after beam returned. https://logbooks.jlab.org/entry/4075542
  • Full target production all night whenever we had beam.
  • Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.