Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(→Shift Summary) |
(→Past 24 hours) |
||
Line 11: | Line 11: | ||
=Wednesday, November 3= | =Wednesday, November 3= | ||
=== Past 24 hours === | === Past 24 hours === | ||
− | * Maintenance day | + | * Maintenance day. Got Beam Back in the Swing shift. |
− | * Harp scans after beam | + | * Harp scans after beam returned. https://logbooks.jlab.org/entry/4075542 |
− | * Full target production all night | + | * Full target production all night whenever we had beam. |
+ | * Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B. | ||
=== Shift Summary === | === Shift Summary === |
Revision as of 08:26, 3 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Wednesday, November 3
Past 24 hours
- Maintenance day. Got Beam Back in the Swing shift.
- Harp scans after beam returned. https://logbooks.jlab.org/entry/4075542
- Full target production all night whenever we had beam.
- Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
Shift Summary
Issues/Reports
Plan
- Today:
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)