Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...") |
(→Wednesday, November 3) |
||
Line 12: | Line 12: | ||
=== Past 24 hours === | === Past 24 hours === | ||
* Maintenance day | * Maintenance day | ||
+ | * Harp scans after beam returns | ||
+ | * Full target production all night | ||
=== Shift Summary === | === Shift Summary === | ||
Line 26: | Line 28: | ||
* Today: | * Today: | ||
− | |||
− | |||
* 9:30 am Empty target, then start production | * 9:30 am Empty target, then start production | ||
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | * After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) |
Revision as of 07:26, 3 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Wednesday, November 3
Past 24 hours
- Maintenance day
- Harp scans after beam returns
- Full target production all night
Shift Summary
Issues/Reports
Plan
- Today:
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)