RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle

Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs

  • Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
  • PS study for flux normalization
  • CCAL test with 2nA beam to test new dividers

The most notable issues were

  • Goniometer controler board has to be replaced
  • It was difficult to nudge the coherent peak probably because the diamond degraded
  • Few FCAL bases have to be replaced