Run Coordinator report: Summer 2020 w8
From GlueXWiki
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
- Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
- PS study for flux normalization
- CCAL test with 2nA beam