Line 3: Line 3:
 
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
 
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
  
#*Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
+
*Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
#*PS study for flux normalization
+
*PS study for flux normalization
#*CCAL test with 2nA beam to test new dividers
+
*CCAL test with 2nA beam to test new dividers
  
 
The most notable issues were  
 
The most notable issues were  
  
#* Goniometer controler board has to be replaced
+
* Goniometer controler board has to be replaced
#* It was difficult to nudge the coherent peak probably because the diamond degraded
+
* It was difficult to nudge the coherent peak probably because the diamond degraded
#* Few FCAL bases have to be replaced
+
* Few FCAL bases have to be replaced

Revision as of 09:05, 6 October 2020

RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle

Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs

  • Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
  • PS study for flux normalization
  • CCAL test with 2nA beam to test new dividers

The most notable issues were

  • Goniometer controler board has to be replaced
  • It was difficult to nudge the coherent peak probably because the diamond degraded
  • Few FCAL bases have to be replaced