Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
 
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
 +
 
#*Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
 
#*Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
 
#*PS study for flux normalization
 
#*PS study for flux normalization
 
#*CCAL test with 2nA beam to test new dividers
 
#*CCAL test with 2nA beam to test new dividers
 +
 
The most notable issues were  
 
The most notable issues were  
 +
 
#* Goniometer controler board has to be replaced
 
#* Goniometer controler board has to be replaced
 
#* It was difficult to nudge the coherent peak probably because the diamond degraded
 
#* It was difficult to nudge the coherent peak probably because the diamond degraded
 
#* Few FCAL bases have to be replaced
 
#* Few FCAL bases have to be replaced

Revision as of 09:05, 6 October 2020

RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle

Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs

    • Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
    • PS study for flux normalization
    • CCAL test with 2nA beam to test new dividers

The most notable issues were

    • Goniometer controler board has to be replaced
    • It was difficult to nudge the coherent peak probably because the diamond degraded
    • Few FCAL bases have to be replaced