Difference between revisions of "Run Coordinator report: Summer 2020 w8"
From GlueXWiki
(Created page with "RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. # Physics production: total...") |
|||
Line 1: | Line 1: | ||
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle | RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle | ||
− | Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. | + | Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs |
# Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B | # Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B | ||
+ | # PS study for flux normalization | ||
+ | # CCAL test with 2nA beam |
Revision as of 08:59, 6 October 2020
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
- Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
- PS study for flux normalization
- CCAL test with 2nA beam