Difference between revisions of "Run Coordinator report: Summer 2020 w8"

From GlueXWiki
Jump to: navigation, search
(Created page with "RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. # Physics production: total...")
 
Line 1: Line 1:
 
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
 
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
  
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL.
+
Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs
 
# Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
 
# Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
 +
# PS study for flux normalization
 +
# CCAL test with 2nA beam

Revision as of 08:59, 6 October 2020

RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle

Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. The downtime was 10.4hrs

  1. Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
  2. PS study for flux normalization
  3. CCAL test with 2nA beam