Difference between revisions of "Run Coordination Meetings: Spring 2017 Run"

From GlueXWiki
Jump to: navigation, search
(Runplan time charts)
Line 180: Line 180:
  
 
== Runplan time charts==
 
== Runplan time charts==
*[https://halldweb.jlab.org/wiki/index.php/Fall_2016_Run_time_charts View commissioning time chart]
+
*[https://halldweb.jlab.org/wiki/index.php/Fall_2017_Run_time_charts View commissioning time charts]
<!-- *[https://halldweb.jlab.org/wiki/index.php/Fall_2016_Run_time_charts_nogoni View commissioning time chart without goniometer available from the start]-->
+
<!--  
 
*[https://halldweb.jlab.org/wiki/index.php/Fall_2016_Run_time_charts_progress View progress]
 
*[https://halldweb.jlab.org/wiki/index.php/Fall_2016_Run_time_charts_progress View progress]
 +
-->
 
----
 
----
 
  
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]

Revision as of 19:43, 10 January 2017

Meeting General Agenda

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

  • Beam energy expected: 11.632 GeV (include synchrotron radiation losses, except for the Hall D ramp).
  • Solenoid on at 1350A. Any field changes should be avoided if possible.
  • Beam current: CW 1 nA-1.5 μA. 250 MHz frequency.
  • FFB on or Position Slow Lock on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer diamond radiators:
      • J1a50       (50 μm - 4.1·10-4 R.L., 4×4 mm²) - old crystal - excellent rocking curve
      • JD70-100 (58 μm - 4.8·10-4 R.L., 7×7 mm²) - new crystal - excellent rocking curve
      • JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - new crystal - good rocking curve
      • JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - new crystal - wider rocking curve - marginally usable
    • We also have one 10 μm Al radiator.
    • Amorphous
      • 1.5 µm Al (1.7·10-5 R.L.)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Both 5 mm diameter and 3.4 mm diameter. Default running: 5.0 mm

General Information

This document describes the run plan for the Hall D Spring 2017 run.

  • Schedule for the Spring 2017 run:
  1. Jan. 26th-Jan. 29th: Electron beam restoration
  2. Jan. 30th-Mar. 22nd: Hall D Spring run.
  3. Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.
  • Experiment: GlueX E12-06-102 Production
  • Planned tests:
    • High-intensity GlueX test (invasive, 3 shifts)
    • TPol low energy photon run (invasive, 2 shifts)
    • ComCAL(PrimeX) prototype test (parasitic)
  • Expected Staffing and responsibilities:
    • The Run Coordinator oversees the commissioning:
      • Thur. Jan. 26 - Sun. Jan. 29 (4 days): A. Deur (accelerator restoration)
      • Mon. Jan. 30 - Wed. Feb. 8 (10 days): A. Deur
      • Wed. Feb. 8 - Wed. Feb. 15 (7 days): M. Dalton (with Mon. 6th - Wed. 8th overlap)
      • Wed. Feb. 15 - Wed. Feb. 22 (7 days): A. Ostrovidov (with Mon. 13th - Wed. 15th overlap)
      • Wed. Feb. 22 - Wed. Mar. 1 (7 days): W. Boeglin (with Mon. 20th - Wed. 22nd overlap)
      • Wed. Mar. 1 - Wed. Mar. 8: (7 days): S. Dobbs (with Mon. 27th - Wed. 1st overlap)
      • Wed. Mar. 8 - Wed. Mar. 15: (7 days): R. Jones (with Mon. 6th - Wed. 8th overlap)
      • Wed. Mar. 15 - Wed. Mar. 22: (7 days): D. Lawrence (with Mon. 13th - Wed. 15th overlap)


Runplan

Hall D white board (current run plan)

Hall D counting room white board

Runplan time charts


Accelerator status

Hot Checkout

  1. Hot Check OUT Status 100% ready ; 0% checked ; 0% not ready

Readiness for Fall 16 run

  • <Solenoid (Eugene/Beni) is Ready.
    • Check with Spring16 data that running at 1350A vs 1200A is beneficial (Paul Mattione/Mike/Alex) Running at 1350A is prefereable for GlueX.
    • Will ramp to 100 A a few days before the start of the run, then leave power supply on at 0 V until experiment. Done.
  • Surveys (Tim/Tom)
    • Target Fiducialization/alignment (Monday Sept. 19) Done
    • Tagger Microscope alignment, Tagger Hodoscope Survey (Tuesday Sept 20) Done
    • Start Counter Alignment, Target Cart Alignment (Thu. Sept 22) Done
    • Primary Collimator Fiducialization/alignment, Beam Profiler Alignment (Fri Sept 23) Done
    • CompCal Fiducialization/Alignment (Monday Sept 26) Done
    • PS High Granularity Alignment, PS beamline alignment (Tuesday Sept 27) Done
    • TAGH needs to be resurveyed.
    • Goniometer fiducialization.
  • DAQ (Sergei)
    • Waiting on Trigger to be ready.
    • Most systems are tested. Successfully ran at 60 kHz, 99% livetime.
  • Trigger (Alex S.)
    • System is robust. Running on cosmics. Still a few problems to be addressed:
      • FDC F125 send error messages. Fixed
      • F250 DAC sometimes fails. Fixed
      • Problem with PS/Start Counter crate: TDC sometimes generates readout problem. Problem seems to now be gone but need to be checked.
      • Problem with TagM. TDC crate. Fixed now.
  • Beam line
    • Diamond status.
      • 3 new and characterized diamonds are now JLab.
    • Tagger hodoscope (Nathan/Franz)
      • Remove protective plastic tubes. Franz to remove part of them this week (Sept. 19-23). Done on 19th.
      • Once tubes are removed, need to check for light leak with scalers. Done.
      • Needs to be resurveyed
      • Needs testing with DAQ<strike>
    • <strike>Tagger microscope (Alex B./Richard) TAGM is ready
      • waiting for survey to be completed before doing hot check out. Done
      • Need to put back shielding.
      • 1 MPOD to power preamp errors out, Alex B following up. Blower on and shroud covered, ready for dark rate testing.
    • Goniometer (Hovanes)
      • Goniometer is back. Issue with control hardware. Need to be fixed and tested.
      • To be fiducialized. Done.
    • Collimator, Active collimator, profiler, flux monitor (Alex B./Hovanes).
      • AC installed and wired, needs DAQ testing A.C. needs some fine tuning.
      • Flux monitor cabled (was this verified?)
      • Collimator vertical motion control is done. 2D scan procedure is written.
      • Profiler is ready.
    • PS system (Alex S.)
      • Need software for online monitoring of photon flux.
      • Replace thermal pads?: Will decide this week (Sept. 19-23). No time to installed them for this run.
      • Installed, alignment in progress
      • High Granularity detector had Power Supply glitches. Now fixed.
      • Needs DAQ testing
    • Polarimeter (M. Dugger/Nathan) Polarimeter is ready
      • Now under vacuum.
      • Signals seen on all channels with source and scope.
      • DAQ tested
    • Target (Tim/Alexandre D.)
      • Ice test done. Leak fixed. Thin frost seen. Will add MLI to improve insulation. Leak fixed.
      • Target is now inserted.
    • TAC (Hovanes) TAC is ready and (re)checked.
    • Slow control (Hovanes)
      • Goniometer motion.
      • Need to work on vertical col. motion and need to program ComCal. (PrimEx detector) motion.
      • Have implemented temperature thr. that shut down the crates. For now, they will operate between 62F<T<82F
    • RF (Paul Mattione)
      • Fernando is implementing new TDC firmware for CAEN.
      • New board is installed.
      • Then, Paul to test the RF system.
    • Radiation monitors
      • Need to move a photon probe near goniometer. Done
      • Install OSL and chromosticks<strike>
  • Detector systems
    • ST (Mark Ito)
      • <strike>Was test-cabled. Will be de-cabled, inserted and re-cabled.
      • Inserted, powered up, working with stand alone DAQ.
      • Crate burned 2 TI modules. Removed from main DAQ readout.
      • ST is now re-installed and need to be rechecked..
    • FDC (Lubomir)
      • One sector doesn't hold HV (no change)
      • Strange noise seen on each 3rd card of each chamber. Seen at 60 kHz but not at 1 kHz.
    • CDC (Beni)
      • Up and running
      • Calibrated baselines, problems with 2 channels
      • 2 weekends of cosmic data desired.
    • BCal (Elton)
      • Was turned on on Sept. 14th. Turned on LED pulser too. One of the LED low voltage doesn't work. Chris is checking it.
      • Stand alone DAQ run, all LV and SiPMs working. Intermittent problems with ADCs, possibly initialization.
      • Checked data and saw that many channels are missing. TDC were missing. This is fixed now
    • FCal (Adesh)
      • Was turned on this week (Sept. 19-23).. On since then.
      • Replaced 22 bases week of 19-24 Sept, more failures since at rate of 1-2 per day.
      • Keep replacing basis when needed.
      • Adesh to do the HCO. Done
    • TOF (Mark Ito/Beni/Alex. Ostrovidov)
      • Beni: was able to do a first calibration but unable to do it anymore. Replacing a HV module.
      • Currently taking data for TDC correction tables.
      • Paul E. would like to install a lucite shield. Fitting it was tested and it fits fine.
      • Need to verify that all ADC channels are set-up correctly.
  • Online monitoring (David L.)
    • Implemented Root 6
    • Check compatibility with new F250 format. (One aspect of format might cahnge this week)
    • Ready to go with occupancy and new higher level reconstruction histograms
    • As ready as can be.
  • Calibration/reconstruction/offline monitoring (Paul Mattione)
    • Ready.
  • Level 3 Trigger (David L.)
    • As ready as can be given the uncertainty on what to do.
  • Safety documents (Beni):
    • ESAD must be updated to include safety procedure for ComCal. motion.
    • ESAD ready, RSAD should be ready.
  • Hall Status/safety (Tom/Tim)
    • Ready
  • Other topics?