Difference between revisions of "RunPeriod-2023-01 Validation"

From GlueXWiki
Jump to: navigation, search
(Physics Production Runs)
(Physics Production Runs)
Line 17: Line 17:
  
 
* Starting at: 120286
 
* Starting at: 120286
 +
* Ending at: 121207
  
 
'''Run Lists'''
 
'''Run Lists'''

Revision as of 11:09, 30 March 2023

2020 Run

Calibration/Tuning

  • First day check out: 120169 (raw), 120170
  • First CDC HV scan: 120171-120175
  • More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120222
  • More production, new TAGM settings: 120237, 120238, 120243, 120244, 120245, 120246
    • CDC HV scan: 120240, 120241, 120242 (250 nA); 120247, 120248, 120249, 120250 (350 nA)
  • Production with missing TOF ADC: 120266, 120267, 120268, 120271, 120274, 120275
    • checkout: 120264 (raw mode), 120265
  • Radiator scan: 120277 - 120285

Maybe go to full physics production after this?

Physics Production Runs

  • Starting at: 120286
  • Ending at: 121207

Run Lists

Notes

  • logbook entries are mostly missing, but 120290-3 look like junk?
  • Bad RF (TAGH, but let's toss it): 120634