Difference between revisions of "RunPeriod-2023-01 Validation"
From GlueXWiki
(→Calibration/Tuning) |
(→Calibration/Tuning) |
||
Line 6: | Line 6: | ||
* First CDC HV scan: 120171-120175 | * First CDC HV scan: 120171-120175 | ||
* More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120222 | * More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120222 | ||
+ | * More production, new TAGM settings: 120237, 120238, 120243, 120244, 120245, 120246 | ||
+ | ** CDC HV scan: 120240, 120241, 120242 (250 nA); 120247, 120248, 120249, 120250 (350 nA) | ||
== Physics Production Runs == | == Physics Production Runs == |
Revision as of 11:27, 17 January 2023
2020 Run
Calibration/Tuning
- First day check out: 120169 (raw), 120170
- First CDC HV scan: 120171-120175
- More production after ST/BCAL baseline recalibration, new TAGM voltages, bad TAGH crate: 120207-120222
- More production, new TAGM settings: 120237, 120238, 120243, 120244, 120245, 120246
- CDC HV scan: 120240, 120241, 120242 (250 nA); 120247, 120248, 120249, 120250 (350 nA)