Difference between revisions of "Preparation for 2021 Run"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
  
 
;Aligning FCAL in the Hall  
 
;Aligning FCAL in the Hall  
: Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- '''Tim  Whitlatch'''
+
: Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the FCAL hole (3x3 modules). The exact position should be confirmed by the alignment group -- '''Tim  Whitlatch'''
  
  

Revision as of 16:18, 10 September 2020

Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021


Aligning FCAL in the Hall
Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the FCAL hole (3x3 modules). The exact position should be confirmed by the alignment group -- Tim Whitlatch


Perform preventive replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events.
Several bases have already been replaced in this area. The status of FCAL bases in the 3 inner FCAL rings was provided by Colin and is presented in the link below.
Status of FCAL dividers in 3 inner rings