Difference between revisions of "Preparation for 2021 Run"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
;Aligning FCAL in the Hall  
 
;Aligning FCAL in the Hall  
 
: Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- '''Tim  Whitlatch'''
 
: Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- '''Tim  Whitlatch'''
 +
 +
;Perform preventive replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events.
  
 
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings]
 
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings]

Revision as of 16:15, 10 September 2020

Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021


Aligning FCAL in the Hall
Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- Tim Whitlatch
Perform preventive replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events.

Status of FCAL dividers in 3 inner rings