Line 2: Line 2:
  
  
# Aligning FCAL in the Hall; moving by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position  
+
;Aligning FCAL in the Hall  
 +
: Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position  
 
should be confirmed by the alignment group -- '''Tim  Whitlatch'''
 
should be confirmed by the alignment group -- '''Tim  Whitlatch'''
  
 
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings]
 
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings]

Revision as of 16:08, 10 September 2020

Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021


Aligning FCAL in the Hall
Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position

should be confirmed by the alignment group -- Tim Whitlatch

Status of FCAL dividers in 3 inner rings