Difference between revisions of "Preparation for 2021 Run"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
'''Below are some action items which we would like to fix before the PrimEx Phase II run in  
+
'''Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021'''
Spring/Summer 2021'''
+
  
  
# Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the  
+
# Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the  
beam goes through the middle of the hole. The exact position should be confirmed by the  
+
the alignment group -- '''Tim  Whitlatch'''
the alignment group -- Tim  Whitlatch
+
  
 
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings]
 
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings]

Revision as of 16:01, 10 September 2020

Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021


  1. Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the

the alignment group -- Tim Whitlatch

Status of FCAL dividers in 3 inner rings