Difference between revisions of "Photon Beam Commissioning Discussion July 16, 2014"

From GlueXWiki
Jump to: navigation, search
(Action Items)
(Action Items)
Line 20: Line 20:
 
* Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
 
* Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
 
* Check that 'rapid access system' is being implemented in Hall D (Alexandre)
 
* Check that 'rapid access system' is being implemented in Hall D (Alexandre)
 +
* Organize preparations for review (Elton).
  
 
== Agenda ==
 
== Agenda ==

Revision as of 09:45, 10 July 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send link to accelerator commissioning procedure (Mike)
  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard)
  • Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
  • Check that radiator set for commissioning is available (Alexandre, Hovanes)
  • Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
  • Check that 'rapid access system' is being implemented in Hall D (Alexandre)
  • Organize preparations for review (Elton).

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Eugene)
  4. Goals for Aug 8 Review
  5. Other business

Minutes

  • Attending: