Difference between revisions of "PMT & Divider"

From GlueXWiki
Jump to: navigation, search
(PMT Active Base)
Line 41: Line 41:
  
 
*[https://logbooks.jlab.org/entry/3763897 Beam test of the modified bases]
 
*[https://logbooks.jlab.org/entry/3763897 Beam test of the modified bases]
 +
 +
*[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4361 Estimates of the PMT Anode Current of the CCAL (FCAL2) Modules]

Revision as of 12:33, 24 February 2020

PMTs

  • Hamamatsu R4125 PMT:
Specs
gain-HV
socket
Dynode location


  • Magnetic shielding
  • TOSCA calculation (by Sasha Glamazdin)
presentation
(ppt file location /u/group/halld/Subsystems/HFCal/talk/Hybrid_FCal_shield.pptx)
Directory with TOSCA results /u/group/halld/Subsystems/HFCal/.
Prototype of the PMT housing (magnetic field shielding)




PMT Active Base

Modified Active Bases (2020)

Three modified active bases were installed on the CCAL