Difference between revisions of "October 19, 2012 PID Upgrade"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == Friday October19, 2012 at 1:30pm At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, please u...") |
(→Connections) |
||
Line 8: | Line 8: | ||
# ) ESNET: 8542553<br/> | # ) ESNET: 8542553<br/> | ||
# ) EVO: A conference has been booked under "GlueX PID Upgrade" from 12:30pm until 4:00pm (EDT). | # ) EVO: A conference has been booked under "GlueX PID Upgrade" from 12:30pm until 4:00pm (EDT). | ||
− | ## ) To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, | + | ## ) To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, |
+ | 147880. Instructions for the | ||
## )[http://evo.caltech.edu/evoGate/Documentation/extclient/telephone/telephone.html Phone Bridge] to EVO. | ## )[http://evo.caltech.edu/evoGate/Documentation/extclient/telephone/telephone.html Phone Bridge] to EVO. | ||
## ) [http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html Skype Bridge] to EVO | ## ) [http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html Skype Bridge] to EVO |
Revision as of 13:04, 12 October 2012
Meeting Time and Place
Friday October19, 2012 at 1:30pm At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- ) EVO: A conference has been booked under "GlueX PID Upgrade" from 12:30pm until 4:00pm (EDT).
- ) To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code,
147880. Instructions for the
- )Phone Bridge to EVO.
- ) Skype Bridge to EVO
- )To connect by telephone, dial:
- ) You can look up toll-free number at http://www.readytalk.com/intl
- ) US and Canada: (866)740-1260 (toll free)
- ) International: (303)248-0285 (toll call)
- ) enter access code followed by the # sign: 3421244#
Agenda
- Announcements
- Status of Hardware Designs in GEANT (Matt)
- Status of parameters for the proposed PID systems.
- Status of Kinematic Fitting:
- AOT