==Announcements==
 
==Announcements==
 +
 +
Elliott noted that Mark D is the point of contact for all changes to DAQ hardware in the hall.  I.e. coordinate with Mark prior to changing any modules, modifying any wiring, etc.
  
  
Line 68: Line 70:
  
 
==Minutes==
 
==Minutes==
 +
 +
Present:  Elliott W, Simon T, Bryan M, Serguei P, Beni Z, Sean D, Dave A, Hovanes E, Alex S.
 +
 +
 +
 +
'''FCAL Switch'''
 +
 +
FCAL swtiches being installed using interim Ethernet connections.  We decided that on all switches (except solenoid controls) the top left 9 ports will be reserved for DAQ, the remainder for controls.  Dave A suggested we reserve 10 for DAQ in case we need a spare.
 +
 +
 +
 +
'''Telecom Fiber Installation'''
 +
 +
It is now in the hands of Facilities (Jason W) to work with Tom C and Shields to get a quote.
 +
 +
 +
 +
'''Front End Firmware'''
 +
 +
* Updated trigger distribution firmware will be ready soon (for TI, TS, etc) for distribution of block readout levels.
 +
* Ed should have updated FADC250 and F1TDC firmware next week.
 +
* Cody will implement the readout conventions in the FADC125 in a few months, after the modules are working and tested.
 +
* Firmware for CTP, SSP, GTP under development.
 +
* Bryan M will modify readout libs as needed for the new firmware.  You will have to use the lib corresponding to the firmware in your modules.
 +
 +
 +
 +
'''Trigger Fibers'''
 +
 +
Chris said there is one week delivery for trigger fibers.  He will order them as needed and his guys will install them.  He will install them as the cable trays become available and as the need arises.
 +
 +
 +
 +
'''Raid-to-Silo Transfer'''
 +
 +
Elliott and Paul will get the raid-to-silo system going.  Initial vsn will just move files as they appear in the staging area (delete-on-copy).  Eventually files will be kept on the RAID system until space is needed (just-in-time-deletion).  In order to have reasonable numbers of data files in a single directory the dirs will be organized by run period and run number.
 +
 +
 +
 +
'''af

Revision as of 13:22, 6 November 2013

Video Conferencing

We will be connected via ESnet using the standard GlueX number: 8542553


Agenda

*** Turn on conference equipment ***

  • Announcements
    • DAQ coordination in hall - Mark D, Elliott
  • Review of minutes from 9-Oct-2013 meeting
  • FCAL switch status - Elliott
  • Telecom fiber installation status - Hovanes, Dave L, Mark D, Elliott
  • Front-end module firmware and readout libs - Elliott, Dave A, Bryan M
  • Trigger fiber installation schedule - Chris C, Elliott
  • RAID-to-silo transfer - Mark I, Dave L, Elliott
    • 10 GB file every 30 secs!
    • Directory structure: by run period and run number
    • File deletion model: "on copy" vs "just in time" vs ???
  • Trigger/DAQ for FCAL tests - Mark D, John L, Serguei P, Alex S
  • Farm Manager - Vardan, Dave L, Elliott
  • CODA3 installation and DAQ testing - Mark D, Dave A
  • ROC order - Dave A
  • evioETChannel - Elliott
  • Online databases - Mark I, Elliott
    • conDB
    • calDB or CCDB
  • JInventory database update - Serguei P.
  • EPICS update - Hovanes, Nerses, Vanik
    • Alarm system, etc.
  • Controls update - Dave B, Elliott
    • New subnet, solenoid, FCAL darkroom, BCAL, Gas system, CDC, etc.
  • DAQ group status reports - Bryan M, Dave A, Graham, Carl, Vardan
    • GIT, EVIO, cMsg, CODA3, ECS/CSS, disentangler, readout list, Java/cMsg GUI
  • Electronics and trigger status reports - Chris, Alex, Fernando, Ben, Ed, William, Bryan M
  • Mantis Task Tracker
  • Midas Elog


  • Upcoming topics
    • raw data, compressed vs uncompressed
    • Calibration/Alignment issues?
    • Status of processing uncompressed and compressed simulated raw data and monitoring/L3 farm - Dave L, Elliott
      • Linux SBC configuration, installation, booting - by Bryan
      • Infiniband installation and management - by Dave A
    • Ed to talk more on FPGA programming


Time/Location

1:30 PM Wed 23-Oct-2013 CC F326


Announcements

Elliott noted that Mark D is the point of contact for all changes to DAQ hardware in the hall. I.e. coordinate with Mark prior to changing any modules, modifying any wiring, etc.



Next Meeting

1:30 PM Wed 6-Nov-2013 CC F326


Minutes

Present: Elliott W, Simon T, Bryan M, Serguei P, Beni Z, Sean D, Dave A, Hovanes E, Alex S.


FCAL Switch

FCAL swtiches being installed using interim Ethernet connections. We decided that on all switches (except solenoid controls) the top left 9 ports will be reserved for DAQ, the remainder for controls. Dave A suggested we reserve 10 for DAQ in case we need a spare.


Telecom Fiber Installation

It is now in the hands of Facilities (Jason W) to work with Tom C and Shields to get a quote.


Front End Firmware

  • Updated trigger distribution firmware will be ready soon (for TI, TS, etc) for distribution of block readout levels.
  • Ed should have updated FADC250 and F1TDC firmware next week.
  • Cody will implement the readout conventions in the FADC125 in a few months, after the modules are working and tested.
  • Firmware for CTP, SSP, GTP under development.
  • Bryan M will modify readout libs as needed for the new firmware. You will have to use the lib corresponding to the firmware in your modules.


Trigger Fibers

Chris said there is one week delivery for trigger fibers. He will order them as needed and his guys will install them. He will install them as the cable trays become available and as the need arises.


Raid-to-Silo Transfer

Elliott and Paul will get the raid-to-silo system going. Initial vsn will just move files as they appear in the staging area (delete-on-copy). Eventually files will be kept on the RAID system until space is needed (just-in-time-deletion). In order to have reasonable numbers of data files in a single directory the dirs will be organized by run period and run number.


af