Difference between revisions of "OWG Meeting 20-Nov-2013"
From GlueXWiki
m |
m |
||
Line 11: | Line 11: | ||
* Review of minutes from [[OWG_Meeting_6-Nov-2013 | 6-Nov-2013]] meeting | * Review of minutes from [[OWG_Meeting_6-Nov-2013 | 6-Nov-2013]] meeting | ||
* Online data challenge - Mark D, Dave L, Elliott | * Online data challenge - Mark D, Dave L, Elliott | ||
− | * Front-end module firmware | + | * Front-end module firmware testing - Mark D, Dave L, Elliott |
* Farm Manager - Vardan, Dave L, Elliott | * Farm Manager - Vardan, Dave L, Elliott | ||
* CODA3 installation and DAQ testing - Mark D, Dave A | * CODA3 installation and DAQ testing - Mark D, Dave A | ||
* Telecom fiber installation status - Hovanes, Elliott | * Telecom fiber installation status - Hovanes, Elliott | ||
− | * Trigger fiber installation schedule - Chris C | + | * Trigger fiber installation schedule - Chris C |
* Online databases - Elliott, Dmitry | * Online databases - Elliott, Dmitry | ||
** what level of unification is possible? | ** what level of unification is possible? | ||
Line 22: | Line 22: | ||
** FCAL, BCAL/SiPM, FDC, etc. | ** FCAL, BCAL/SiPM, FDC, etc. | ||
* EPICS update - Hovanes, Vanik | * EPICS update - Hovanes, Vanik | ||
− | ** Alarm system, etc. | + | ** Alarm system, HV/LV, etc. |
* Controls update - Dave B, Elliott | * Controls update - Dave B, Elliott | ||
** FCAL darkroom, BCAL, Gas system, CDC, PS, solenoid, etc. | ** FCAL darkroom, BCAL, Gas system, CDC, PS, solenoid, etc. |
Revision as of 12:55, 19 November 2013
Contents
Video Conferencing
We will be connected via ESnet using the standard GlueX number: 8542553
Agenda
*** Turn on conference equipment ***
- Announcements
- Review of minutes from 6-Nov-2013 meeting
- Online data challenge - Mark D, Dave L, Elliott
- Front-end module firmware testing - Mark D, Dave L, Elliott
- Farm Manager - Vardan, Dave L, Elliott
- CODA3 installation and DAQ testing - Mark D, Dave A
- Telecom fiber installation status - Hovanes, Elliott
- Trigger fiber installation schedule - Chris C
- Online databases - Elliott, Dmitry
- what level of unification is possible?
- CCDB, conDB, trigDB, translation table, SiPM, EPICS/Nerses, etc.
- JInventory database update - Elliott, Serguei P
- FCAL, BCAL/SiPM, FDC, etc.
- EPICS update - Hovanes, Vanik
- Alarm system, HV/LV, etc.
- Controls update - Dave B, Elliott
- FCAL darkroom, BCAL, Gas system, CDC, PS, solenoid, etc.
- DAQ group status reports - Bryan M, Dave A, Graham, Carl, Vardan
- GIT, EVIO, cMsg, CODA3, ECS/CSS, disentangler, readout list, Java/cMsg GUI
- Electronics and trigger status reports - Chris, Alex, Fernando, Ben, Ed, William, Bryan M
- Mantis Task Tracker
- Midas Elog
- Upcoming topics
- raw data, compressed vs uncompressed
- Calibration/Alignment issues?
- Status of processing uncompressed and compressed simulated raw data and monitoring/L3 farm - Dave L, Elliott
- Ed to talk more on FPGA programming
Time/Location
1:30 PM Wed 20-Nov-2013 CC F326
Announcements
Next Meeting
1:30 PM Wed 4-Dec-2013 CC F326