* Announcements -  
 
* Announcements -  
 
* Review of minutes from [[OWG Meeting 28-Oct-2009 | 28-Oct-2009]] meeting
 
* Review of minutes from [[OWG Meeting 28-Oct-2009 | 28-Oct-2009]] meeting
* Brief report from ICALEPCS 2009 - Elliott, Vardan
+
* Update from DAQ Group - Dave A
* DAQ software development status - Graham
+
* [[Media:11nov2009_moffit.pdf|Linux ROC development]] - Bryan
 +
* Brief report from [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1385 EPICS collaboration meeting and ICALEPCS 2009 conference] - Elliott
 
* Coil test update - Elliott
 
* Coil test update - Elliott
 
* Other electronics and trigger status reports - Chris, Ben, Ed, Alex, Dave
 
* Other electronics and trigger status reports - Chris, Ben, Ed, Alex, Dave
Line 25: Line 26:
  
  
1:30 PM Wed 25-Nov-2009  
+
1:30 PM Wed 9-Dec-2009  
  
  
Line 34: Line 35:
  
 
=Minutes=
 
=Minutes=
 +
11nov2009_moffit.pdf
 +
Attendees:  Elliott W, Simon T, Mark I, Alex S, Bryan M, Carl t, Dave A, Ed J, Eugent C.
  
Attendees:
+
 
 +
'''DAQ Update'''
 +
 
 +
Dave A discussed the current status of and recent project in the JLab DAQ group:
 +
 
 +
* DAQ goup now fully staffed, recent hires Bryan Moffit and William Gu.
 +
* Have enough staff to meet 12 GeV obligations and deliver CODA 3 on time.
 +
* Bryan recently working on Linux ROC, William working on TI and TD boards.
 +
* CODA 2.6.1 release soon, COOL-based run control state machine.
 +
** uses latest cMsg and AFECS
 +
* Haven't started working on farm software yet.
 +
* Carl is working on fixing remaining cMsg VxWorks bugs.
 +
 
 +
 
 +
'''Linux ROC'''
 +
 
 +
* See Bryan's slides (link above) for more details;
 +
* Using the GE FANUC dual-core VME board.
 +
* Has 4 GB flash memory, Tempe chip (interface to VME).
 +
* Supports 2ESST.
 +
* Has longer interrupt latency and DMA setup than the Motorola PowerPC board, but this is not an issue.
 +
* Bryan had to modify the GE-supplied software to get better performance, including the Tempe libs.
 +
* The F1, FADC, and TI libs now work with the GE FANUC board.
 +
* Worked on scheduling, latencies, DMA speeds.
 +
* Improving core mgmt for threads gained 20 micro-sec.
 +
* Not using any version of real-time Linux, only real-time extensions.
 +
 
 +
 
 +
 
 +
'''ICALEPCS 2009'''
 +
 
 +
Elliott reported on the EPICS collaboration meeting and ICALEPCS 2009 conference held in Kobe, Japan.  See his slides (link above) for details.
 +
 
 +
 
 +
 
 +
'''Coil Test'''
 +
 
 +
Elliott gave a brief update on the status of the coil test.
 +
 
 +
* Steady progress in controls, but problems being found in the coils themselves.
 +
* Solenoid review coming up next week.
 +
* Should be able to use QWeak area nearby.
 +
* New tech hires helping a lot!
 +
* Most instrumentation ordered, a few items left.
 +
* Incorrect wire used for cryo sensors, must be replaced in all four coils.
 +
* Planning to work on three coils for other reasons so replacing wire not a problem.
 +
* Will have to open coil 4 just to replace wire.
 +
* Coil test schedule now extending into late 2010 or beyond.

Latest revision as of 17:13, 24 February 2017

Agenda


Time/Location

1:30 PM Wed 11-Nov-2009 CC F326


Announcements

Next Meeting

1:30 PM Wed 9-Dec-2009


New Action Items from this Meeting

Minutes

11nov2009_moffit.pdf Attendees: Elliott W, Simon T, Mark I, Alex S, Bryan M, Carl t, Dave A, Ed J, Eugent C.


DAQ Update

Dave A discussed the current status of and recent project in the JLab DAQ group:

  • DAQ goup now fully staffed, recent hires Bryan Moffit and William Gu.
  • Have enough staff to meet 12 GeV obligations and deliver CODA 3 on time.
  • Bryan recently working on Linux ROC, William working on TI and TD boards.
  • CODA 2.6.1 release soon, COOL-based run control state machine.
    • uses latest cMsg and AFECS
  • Haven't started working on farm software yet.
  • Carl is working on fixing remaining cMsg VxWorks bugs.


Linux ROC

  • See Bryan's slides (link above) for more details;
  • Using the GE FANUC dual-core VME board.
  • Has 4 GB flash memory, Tempe chip (interface to VME).
  • Supports 2ESST.
  • Has longer interrupt latency and DMA setup than the Motorola PowerPC board, but this is not an issue.
  • Bryan had to modify the GE-supplied software to get better performance, including the Tempe libs.
  • The F1, FADC, and TI libs now work with the GE FANUC board.
  • Worked on scheduling, latencies, DMA speeds.
  • Improving core mgmt for threads gained 20 micro-sec.
  • Not using any version of real-time Linux, only real-time extensions.


ICALEPCS 2009

Elliott reported on the EPICS collaboration meeting and ICALEPCS 2009 conference held in Kobe, Japan. See his slides (link above) for details.


Coil Test

Elliott gave a brief update on the status of the coil test.

  • Steady progress in controls, but problems being found in the coils themselves.
  • Solenoid review coming up next week.
  • Should be able to use QWeak area nearby.
  • New tech hires helping a lot!
  • Most instrumentation ordered, a few items left.
  • Incorrect wire used for cryo sensors, must be replaced in all four coils.
  • Planning to work on three coils for other reasons so replacing wire not a problem.
  • Will have to open coil 4 just to replace wire.
  • Coil test schedule now extending into late 2010 or beyond.