November 7, 2012 tracking CDC/FDC

From GlueXWiki
Revision as of 12:40, 7 November 2012 by Nsjarvis (Talk | contribs) (Minutes)

Jump to: navigation, search

Meeting Time and Place

Wednesday November 7, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. FDC Update
  3. CDC Update
    1. CDC Photos
  4. Calibrations

Minutes

Participants: Curtis, Naomi, Beni, Simon, Lubomir, Mark

  1. FDC Update
  2. CDC Update
    1. Wiring the transition boards was completed last week.
    2. Gary made some a cooling ring with 32 holes in (at a 45 degree angle to the endplate) to blow air onto the electronics and fitted it to the chamber temporarily.
    3. There was a fairly large discrepancy between the volume of air being blown into the chamber and the volume coming out through the bubblers. This is thought to be partly due to a gap in the sealing of the temporary downstream plenum. Whilst the chamber was being inspected for potential leaks, cracks were spotted in the neoprene U-channels forming part of the upstream plenum wall. These will be covered with DP-190 to seal the cracks. Then we will refit the temporary plenum (gasbag) and compare gas flow in and out.