# Announcements
 
# Announcements
#* [https://www.jlab.org/exp_prog/experiment_schedule/2018/20181019_sch.pdf Updated schedule] from JLab management, full energy running through 11/26 and CompCal commissioning to the end of the year
+
#* [https://www.jlab.org/exp_prog/experiment_schedule/2018/20181019_sch.pdf Updated schedule] from JLab management, full energy running through 11/26 and CompCal commissioning for all of December
 
#* All components need to be at JLab and tested by end of December, in preparation for January install
 
#* All components need to be at JLab and tested by end of December, in preparation for January install
 
#* General Particle ID Working Group [https://mailman.jlab.org/mailman/private/gluex-collaboration/2018-October/004986.html announcement], discuss integration of DIRC to physics analysis.  Please respond to Doodle poll.
 
#* General Particle ID Working Group [https://mailman.jlab.org/mailman/private/gluex-collaboration/2018-October/004986.html announcement], discuss integration of DIRC to physics analysis.  Please respond to Doodle poll.
Line 25: Line 25:
 
#*** After work by another vendor, lower (beam right) box has reached to flatness of +/-0.5 mm (+/- 0.022").  Reminder: started with +/- 1 mm measured by JLab survey
 
#*** After work by another vendor, lower (beam right) box has reached to flatness of +/-0.5 mm (+/- 0.022").  Reminder: started with +/- 1 mm measured by JLab survey
 
#*** Latest: plan to setup for machining down a skim cut down to +/- 0.25 mm?  
 
#*** Latest: plan to setup for machining down a skim cut down to +/- 0.25 mm?  
#*** Upper (beam left) box packaged Friday and sent to Lesker
+
#*** Upper (beam left) box packaged Friday and sent to Lesker today
 
#** LED source, fiber feedthroughs and diffuser (All)
 
#** LED source, fiber feedthroughs and diffuser (All)
 +
#*** Stephanie's drawings: [https://halldweb.jlab.org/wiki/images/a/a0/Projected_angle_of_feedthroughs.pdf projected angles] [https://halldweb.jlab.org/wiki/images/8/8b/Diffuser_position.pdf 1" diffuser]
 
#** Dark box enclosure: fabrication and testing (Jason)
 
#** Dark box enclosure: fabrication and testing (Jason)
 
#** Quartz window (with modified flange) (Ernie)
 
#** Quartz window (with modified flange) (Ernie)
 
#* Testing in EEL 226
 
#* Testing in EEL 226
 
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason]
 
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason]
#** Cabling tests and plans for dark box tests
+
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/WM_group_meeting_DIRC_Meeting_November_5_2018.pdf Cabling tests and plans for dark box tests] (Bill/Andrew)
# DAQ integration
+
#*** Chris will make 8' long LV and HV cables to complete
# Slow controls
+
 
# PMT fit results (Andrew)
 
# PMT fit results (Andrew)
 
#* [https://halldweb.jlab.org/wiki/images/e/e0/11_05_DIRC_update_AHurley.pdf Fit update]
 
#* [https://halldweb.jlab.org/wiki/images/e/e0/11_05_DIRC_update_AHurley.pdf Fit update]
#** [https://halldweb.jlab.org/wiki/images/7/71/Adc_spectra_fits_load_10_run_01.pdf run 01]
+
#** [https://halldweb.jlab.org/wiki/images/7/71/Adc_spectra_fits_load_10_run_01.pdf run 01][https://halldweb.jlab.org/wiki/images/2/20/Adc_spectra_fits_load_10_run_02.pdf run 02][https://halldweb.jlab.org/wiki/images/8/8b/Adc_spectra_fits_load_10_run_13.pdf run 13]  [https://halldweb.jlab.org/wiki/images/9/95/Adc_spectra_fits_load_10_run_14.pdf run 14][https://halldweb.jlab.org/wiki/images/e/e7/Adc_spectra_fits_load_10_run_25.pdf run 25][https://halldweb.jlab.org/wiki/images/5/51/Adc_spectra_fits_load_10_run_26.pdf run 26][https://halldweb.jlab.org/wiki/images/9/9d/Adc_spectra_fits_load_10_run_27.pdf run 27][https://halldweb.jlab.org/wiki/images/8/8f/Adc_spectra_fits_field_facing_pmt_debug_reinit_5free_FOM.pdf module 20, with magnetic field]
#** [https://halldweb.jlab.org/wiki/images/2/20/Adc_spectra_fits_load_10_run_02.pdf run 02]
+
#** [https://halldweb.jlab.org/wiki/images/6/63/Pmt_model_NIM_paper.pdf Model NIM reference]
#** [https://halldweb.jlab.org/wiki/images/8/8b/Adc_spectra_fits_load_10_run_13.pdf run 13]   
+
#** [https://halldweb.jlab.org/wiki/images/9/95/Adc_spectra_fits_load_10_run_14.pdf tun 14]
+
#** [https://halldweb.jlab.org/wiki/images/e/e7/Adc_spectra_fits_load_10_run_25.pdf run 25]
+
#** [https://halldweb.jlab.org/wiki/images/5/51/Adc_spectra_fits_load_10_run_26.pdf run 26]
+
#** [https://halldweb.jlab.org/wiki/images/9/9d/Adc_spectra_fits_load_10_run_27.pdf run 27]
+
#** [https://halldweb.jlab.org/wiki/images/8/8f/Adc_spectra_fits_field_facing_pmt_debug_reinit_5free_FOM.pdf module 20, with magnetic field]
+
 
# Software/simulations
 
# Software/simulations
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
+
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. ([https://halldweb.jlab.org/wiki/images/b/b4/LED_110518.pdf Yunjie])
 
#* LED generator (Yunjie)
 
#* LED generator (Yunjie)
 
#* Time-based studies and [https://gluexdirc.mit.edu/expected-photon-yield adding # photons to LUT likelihood] (Maria)
 
#* Time-based studies and [https://gluexdirc.mit.edu/expected-photon-yield adding # photons to LUT likelihood] (Maria)
#* Alignment updates (Cris)
+
#* [https://halldweb.jlab.org/wiki/images/7/7c/DIRC_alignment_First_Closure_Test_CFanelli_Nov5_2018.pdf Alignment updates] (Cris)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# [[Addressing ERR review recommendations]]
 
# [[Addressing ERR review recommendations]]
 
#* Recommendations pertaining to DIRC commissioning should be addressed before installation.
 
#* Recommendations pertaining to DIRC commissioning should be addressed before installation.
 
# AOB
 
# AOB

Latest revision as of 13:57, 5 November 2018

Meeting Information

GlueX DIRC Meeting
Monday November 5, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Updated schedule from JLab management, full energy running through 11/26 and CompCal commissioning for all of December
    • All components need to be at JLab and tested by end of December, in preparation for January install
    • General Particle ID Working Group announcement, discuss integration of DIRC to physics analysis. Please respond to Doodle poll.
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Box window flange modification at Lesker (Ernie/Tim)
        • After work by another vendor, lower (beam right) box has reached to flatness of +/-0.5 mm (+/- 0.022"). Reminder: started with +/- 1 mm measured by JLab survey
        • Latest: plan to setup for machining down a skim cut down to +/- 0.25 mm?
        • Upper (beam left) box packaged Friday and sent to Lesker today
      • LED source, fiber feedthroughs and diffuser (All)
      • Dark box enclosure: fabrication and testing (Jason)
      • Quartz window (with modified flange) (Ernie)
    • Testing in EEL 226
  3. PMT fit results (Andrew)
  4. Software/simulations
  5. Addressing ERR review recommendations
    • Recommendations pertaining to DIRC commissioning should be addressed before installation.
  6. AOB