Difference between revisions of "November 4, 2011 Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Outstanding Action Items)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
  
 
== Agenda ==
 
== Agenda ==
* ESH&Q minute - Installation
+
* ESH&Q minute - safety observations
 
* Announcements  
 
* Announcements  
 
** Giles Brown
 
** Giles Brown
 
** Appraisals status
 
** Appraisals status
** Beneficial occupancy - Dec 1
+
** Walkthrough punchlist/Beneficial occupancy - Dec 1
 +
** Hall D open house Dec 2
 
** Collaboration meeting OCT 3
 
** Collaboration meeting OCT 3
 
** Lehman review Oct 20
 
** Lehman review Oct 20
 
** Lab budget 3 months good
 
** Lab budget 3 months good
 
** JLAB Strategic planning
 
** JLAB Strategic planning
 +
** Presentations available M:\halld\Engineering\Presentations
 
**  training - up to date?
 
**  training - up to date?
 +
** Field trip to Hall D Monday?
 
* CAD update
 
* CAD update
 
* Solenoid install Status - Josh
 
* Solenoid install Status - Josh
Line 26: Line 29:
 
* Beamline update
 
* Beamline update
 
* BCAL assy update
 
* BCAL assy update
 +
* Spare solenoid
 
* Fabrication/installation work - Tom
 
* Fabrication/installation work - Tom
  
 
==Outstanding Action Items==
 
==Outstanding Action Items==
  
* Change Design standards document to include Analysis designation (A001) - Chuck
+
* Discuss with Eugene who owner of Counting house will be - Tim
* Update drawing check list to compare dwg and 3D model (any non-parametric dimensions)
+
* Get with Tom on Beamline fab tasks - Slava
* Post manpower assignments on M drive - Tim
+
* Post .pdf manpower assignments on M drive - Tim
  
 
==Minutes==
 
==Minutes==
  
  
**In attendance W. Crahen,  J. Fochtman,  V. Razmyslovich, J. Lagner, G. Biallas, R. Getz,    W. Sachleben,  Tim Whitlatch,  J. Conger, C. Hutton
+
**In attendance W. Crahen,  J. Fochtman,  V. Razmyslovich, J. Lagner, G. Browns, R. Getz,    W. Sachleben,  Tim Whitlatch,  J. Conger, C. Hutton

Latest revision as of 09:20, 4 November 2011

Friday Nov 04, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • ESH&Q minute - safety observations
  • Announcements
    • Giles Brown
    • Appraisals status
    • Walkthrough punchlist/Beneficial occupancy - Dec 1
    • Hall D open house Dec 2
    • Collaboration meeting OCT 3
    • Lehman review Oct 20
    • Lab budget 3 months good
    • JLAB Strategic planning
    • Presentations available M:\halld\Engineering\Presentations
    • training - up to date?
    • Field trip to Hall D Monday?
  • CAD update
  • Solenoid install Status - Josh
  • TOF/Start counter update
  • FDC construction update - Bill
  • Tagger Magnet/vacuum chamber
  • Target update
  • BCAL readout update
  • CDC update
  • Collimator beamline update
  • Platforms update
  • Mock up update -
  • Beamline update
  • BCAL assy update
  • Spare solenoid
  • Fabrication/installation work - Tom

Outstanding Action Items

  • Discuss with Eugene who owner of Counting house will be - Tim
  • Get with Tom on Beamline fab tasks - Slava
  • Post .pdf manpower assignments on M drive - Tim

Minutes

    • In attendance W. Crahen, J. Fochtman, V. Razmyslovich, J. Lagner, G. Browns, R. Getz, W. Sachleben, Tim Whitlatch, J. Conger, C. Hutton