(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday November 19, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room...")
 
(Agenda)
Line 21: Line 21:
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
 
#** Box window flange modification at Lesker (Ernie/Tim)
 
#** Box window flange modification at Lesker (Ernie/Tim)
#*** Lower (beam right) box machining completed: flat to +/- 0.15 mm (0.006'')
+
#*** Lower (beam right) box machining completed: flat to +/- 0.15 mm (0.006'').  Shipping back from Lesker today.
#*** Upper (beam left) at Lesker for modification
+
#*** Upper (beam left) at Lesker for modification now.
 
#** LED fiber feedthroughs and diffuser
 
#** LED fiber feedthroughs and diffuser
 
#*** ThorLab diffuser and fiber coupling tests (Bill)
 
#*** ThorLab diffuser and fiber coupling tests (Bill)
#*** Diffuser location and projected angles (Stephanie)
+
#*** Diffuser location and projected angles (Stephanie)
 
#** Dark box enclosure: fabrication, testing, and delivery to JLab (Jason)
 
#** Dark box enclosure: fabrication, testing, and delivery to JLab (Jason)
#** Quartz window RTV and delivery schedule (Ernie)
+
#** Quartz window RTV after measurement of lower box at JLab.  Delivery schedule? (Ernie)
 
#* Testing in EEL 226
 
#* Testing in EEL 226
 
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason]
 
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason]

Revision as of 09:51, 19 November 2018

Meeting Information

GlueX DIRC Meeting
Monday November 19, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • All components need to be at JLab and tested by end of December, in preparation for January install
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Box window flange modification at Lesker (Ernie/Tim)
        • Lower (beam right) box machining completed: flat to +/- 0.15 mm (0.006). Shipping back from Lesker today.
        • Upper (beam left) at Lesker for modification now.
      • LED fiber feedthroughs and diffuser
        • ThorLab diffuser and fiber coupling tests (Bill)
        • Diffuser location and projected angles (Stephanie)
      • Dark box enclosure: fabrication, testing, and delivery to JLab (Jason)
      • Quartz window RTV after measurement of lower box at JLab. Delivery schedule? (Ernie)
    • Testing in EEL 226
  3. PMT fit results (Andrew)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
    • LED generator (Yunjie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
  5. Addressing ERR review recommendations
    • Recommendations pertaining to DIRC commissioning should be addressed before installation.
  6. AOB