Line 9: Line 9:
 
* Testing status - Beni/Elton
 
* Testing status - Beni/Elton
 
* LV boxes https://logbooks.jlab.org/entry/3939570
 
* LV boxes https://logbooks.jlab.org/entry/3939570
 +
* Moving of Vertical cable trays and cables inside
 
* Design/Fab/Procurement status
 
* Design/Fab/Procurement status
 
** Lead absorbers - awarded
 
** Lead absorbers - awarded
Line 19: Line 20:
 
** assembly components - drawings released
 
** assembly components - drawings released
 
** Installation drawings in review
 
** Installation drawings in review
* Target Design in work [[image:cpp_target1.jpg|thumb]] [[image:cpp_target2.jpg|thumb]] [[image:cpp_target3.jpg|thumb]] [[image:cpp_target4.jpg|thumb]]
+
* Target Design in work [[image:cpp_target5.jpg|thumb]] [[image:cpp_target6.jpg|thumb]] [[image:cpp_target7.jpg|thumb]] [[image:cpp_target8.jpg|thumb]]
  
  
Line 34: Line 35:
  
 
== Minutes ==
 
== Minutes ==
 
+
* Elton met with nick and discussed LV box. Need to make bracket smaller (1/16" thick) boxes should be on top-north corner of each chamber
 +
* For fiducializing chambers, all four edges or bolt holes can be used to find center. Machining is very accurate
 +
* Proposed chamber orientation good - horizontal x-ray port DS, Vertical x-ray port US
 +
* Rory/Elton requested 4 scintillator paddles, 2 BL and 2 BR in vertical position equally spaced (15" oc). To be held by light guides, maybe a V block
 +
* Lead Target needs to be pressed flat since it is malleable and has the center protruding
 
==Action Items ==
 
==Action Items ==
 +
* Stephanie to design thinner "L" bracket for the LV box
 +
* Tim - Get with S&A group to discuss chamber fiducialization and alignment
 +
* Rory to flatten lead target
 +
* Stephanie to model and place scintillators and attachments
 +
* Release installation drawings - Tim/Stephanie
 +
* continue work on target installation - Bobby

Latest revision as of 15:19, 1 December 2021

Meeting Time and Place

Thursday November 18, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

File:Cpp install assy.pdf
  • Installation/assy 3D Model and dwgs
    • DS Chamber orientation
    • Scintillator orientation
    • assembly components - drawings released
    • Installation drawings in review
  • Target Design in work
    Cpp target5.jpg
    Cpp target6.jpg
    Cpp target7.jpg
    Cpp target8.jpg


  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes

  • Elton met with nick and discussed LV box. Need to make bracket smaller (1/16" thick) boxes should be on top-north corner of each chamber
  • For fiducializing chambers, all four edges or bolt holes can be used to find center. Machining is very accurate
  • Proposed chamber orientation good - horizontal x-ray port DS, Vertical x-ray port US
  • Rory/Elton requested 4 scintillator paddles, 2 BL and 2 BR in vertical position equally spaced (15" oc). To be held by light guides, maybe a V block
  • Lead Target needs to be pressed flat since it is malleable and has the center protruding

Action Items

  • Stephanie to design thinner "L" bracket for the LV box
  • Tim - Get with S&A group to discuss chamber fiducialization and alignment
  • Rory to flatten lead target
  • Stephanie to model and place scintillators and attachments
  • Release installation drawings - Tim/Stephanie
  • continue work on target installation - Bobby