Difference between revisions of "Nov 30, 2010 Calibration/Monitoring"

From GlueXWiki
Jump to: navigation, search
(Background information)
(Tentative Agenda)
Line 13: Line 13:
  
 
# Go over goals/objectives of Monitoring system.
 
# Go over goals/objectives of Monitoring system.
# Christina/George and I are not convinced it is easily doable or practical.
+
# Discuss LED-fibre-light guide concept.
# Start updating the system requirements table and discuss LED plan/options/upgrades.
+
# We need to make a proposal to the working group about these three items and if agreed upon plan how to proceed (via construction MOU with Athens, etc).
+
  
 
= Minutes =
 
= Minutes =

Revision as of 16:21, 1 December 2010

Teleconference Time: 09:30 CST (Regina) / 17:30 GMT+2 (Athens)

  • Direct Polycom-Polycom meeting

Background information

Tentative Agenda

  1. Go over goals/objectives of Monitoring system.
  2. Discuss LED-fibre-light guide concept.

Minutes

Attendees: Christina, George V., Pavlos (Athens), George L., Zisis (Regina)