# Calibration | # Calibration | ||
#* Progress on filling in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]]. | #* Progress on filling in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]]. | ||
− | # | + | # FCAL |
#* Report of timing studies with pmts and time calibration (Jake Bennet) | #* Report of timing studies with pmts and time calibration (Jake Bennet) | ||
− | # | + | #* Approximations of the sqrt( -ln( x) ) function for the timing algorithm (Mihajlo) |
− | ## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| | + | #* Discussion with C. Cuevas & Co. |
− | + | # BCAL | |
− | + | ## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| BCAL readout]] | |
## Resolution studies | ## Resolution studies | ||
− | ## | + | ## BCAL Construction MOU |
##* [[Oct 15, 2008 Calorimetry | Visit to Alberta Oct 15]] | ##* [[Oct 15, 2008 Calorimetry | Visit to Alberta Oct 15]] | ||
+ | ## SiPM progress | ||
+ | ## Readout | ||
+ | ##* Review of use of APDs for readout -- see material above (Serguei) | ||
=Minutes= | =Minutes= | ||
Attending: | Attending: |
Revision as of 15:32, 10 November 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Oct 27 meeting
- Updates on Calibration Specification Table.
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
- Add roadmap for Bcal Roadmap to wiki (Elton)
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Updated schedule with new Fcal procurement dates. (Elke will send this to Matt)
- Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).
- Updated drawings of Bcal modules (including O-ring) for discussions. Tim will see if that can be fitted into designer tasks.
Documents to Review
- For components of the magnetic fields see GlueX-doc-912, Figures 9 and 11.
- APD Material for Serguei's presentation: [1],[2],[3]
Tentative Agenda
- Announcements
- Calibration
- Progress on filling in the Calibration Specification Table.
- FCAL
- Report of timing studies with pmts and time calibration (Jake Bennet)
- Approximations of the sqrt( -ln( x) ) function for the timing algorithm (Mihajlo)
- Discussion with C. Cuevas & Co.
- BCAL
- BCAL readout
- Resolution studies
- BCAL Construction MOU
- SiPM progress
- Readout
- Review of use of APDs for readout -- see material above (Serguei)