1). Mechanical Drawings:
+
==Mechanical Drawings==
 
     Chuck and Tim presented first mechanical drawings of the FDC.
 
     Chuck and Tim presented first mechanical drawings of the FDC.
 
     We went over what they did and made suggestions.
 
     We went over what they did and made suggestions.
Line 23: Line 23:
 
     work with the board designer to finalize annulus size.
 
     work with the board designer to finalize annulus size.
  
2). Cathode Board Update:
+
==Cathode Board Update==
 
     Flex board manufacturer can make boards up to 60in wide.  Brian
 
     Flex board manufacturer can make boards up to 60in wide.  Brian
 
     is working to identify a kapton vendor.  He will have word by
 
     is working to identify a kapton vendor.  He will have word by
Line 30: Line 30:
 
     can be done by the end of the year.
 
     can be done by the end of the year.
 
   - DSC suggested to proceed with sandwich construction using kapton
 
   - DSC suggested to proceed with sandwich construction using kapton
     blanks.  We will wnt to see how quickly the sandwich can be
+
     blanks.  We will want to see how quickly the sandwich can be
 
     put together.
 
     put together.
 
   - Dummy flex board design was completed by Jeff Wilson last week.
 
   - Dummy flex board design was completed by Jeff Wilson last week.
 
     Boards can be sent out as soon as kapton source is identified.
 
     Boards can be sent out as soon as kapton source is identified.
  
3). Full-Scale Tensioning System:
+
==Full-Scale Tensioning System==
 
     Brian is nearly ready to contact the shop to have full-scale
 
     Brian is nearly ready to contact the shop to have full-scale
 
     tensioning system constructed.
 
     tensioning system constructed.
  
4). g10 Source:
+
==G10 Source==
     Brian has identified g10 source and the frame construction can
+
     Brian has identified a G10 source and the frame construction can
 
     proceed once the design is completed.
 
     proceed once the design is completed.
  
5). Daughter Boards:
+
==Daughter Boards==
 
     Simon is looking into connectors for the daughter board.  5-mm
 
     Simon is looking into connectors for the daughter board.  5-mm
 
     spacing may be an issue.  DSC instructed that he talk to Chris
 
     spacing may be an issue.  DSC instructed that he talk to Chris
 
     Cuevas.
 
     Cuevas.
  
6). Budget Work:
+
==Budget Work==
 
     Simon is working on improving our budget estimates for FDC
 
     Simon is working on improving our budget estimates for FDC
 
     construction.  We will go over his work tomorrow.
 
     construction.  We will go over his work tomorrow.
  
 
Minutes prepared by Daniel.  Send any comments or corrections along.
 
Minutes prepared by Daniel.  Send any comments or corrections along.

Latest revision as of 11:59, 11 April 2007

FDC Weekly Meeting

Date: November 8, 2006

Participants: Daniel, Brian, Simon, Chuck, Tim

Next Meeting: Wednesday, November 15, 2006 @ 1:30 p.m.


Mechanical Drawings

   Chuck and Tim presented first mechanical drawings of the FDC.
   We went over what they did and made suggestions.
 - We need to redo the preamp daughter board placement.
    > 6 daughter boards per anode board (96 wires).
    > 12 daughter boards per cathode board (192 cathodes).
    > All daughter boards must be located with 120 deg arc.
 - Work to reduce the number of bolt holes - need to set spacing
   to be compatible with all +/-45 deg, +/-60 deg configurations.
 - Design sealing cams for chamber through-bolts.
 - Possible to use SS end-flange for compression to further reduce
   chamber through holes?
 - Chuck and Tim need O.D. and I.D. of the frame annulus.  Need to
   work with the board designer to finalize annulus size.

Cathode Board Update

   Flex board manufacturer can make boards up to 60in wide.  Brian
   is working to identify a kapton vendor.  He will have word by
   Friday.
 - Brian expects that our flex boards for the mechanical mock-ups
   can be done by the end of the year.
 - DSC suggested to proceed with sandwich construction using kapton
   blanks.  We will want to see how quickly the sandwich can be
   put together.
 - Dummy flex board design was completed by Jeff Wilson last week.
   Boards can be sent out as soon as kapton source is identified.

Full-Scale Tensioning System

   Brian is nearly ready to contact the shop to have full-scale
   tensioning system constructed.

G10 Source

   Brian has identified a G10 source and the frame construction can
   proceed once the design is completed.

Daughter Boards

   Simon is looking into connectors for the daughter board.  5-mm
   spacing may be an issue.  DSC instructed that he talk to Chris
   Cuevas.

Budget Work

   Simon is working on improving our budget estimates for FDC
   construction.  We will go over his work tomorrow.

Minutes prepared by Daniel. Send any comments or corrections along.