1). Chris Cuevas has arranged for someone in the Accelerator Group
+
==Manpower==
 +
    Chris Cuevas has arranged for someone in the Accelerator Group
 
     to do the circuit board design for the FDC wire planes.  Chris
 
     to do the circuit board design for the FDC wire planes.  Chris
 
     will act as the coordinator.
 
     will act as the coordinator.
  
2). The FDC mechanical drawings from Brian are nearing completion.
+
==Mechanical Drawings==
 +
    The FDC mechanical drawings from Brian are nearing completion.
 
     They should be ready by the end of next week.  This will include
 
     They should be ready by the end of next week.  This will include
 
     instructions for the CAD layout.
 
     instructions for the CAD layout.
  
3). The small-scale prototype cathodes have a Cu thickness of 1/7 oz.
+
==Copper Thickness==
 +
    The small-scale prototype cathodes have a Cu thickness of 1/7 oz.
 
     Simon will check with Fernando and Gerard if this is expected to
 
     Simon will check with Fernando and Gerard if this is expected to
 
     be a problem.
 
     be a problem.
  
4). The 49 in x 49 in Rohacell sheets are in.  We talked about
+
==Rohacell==
 +
    The 49 in x 49 in Rohacell sheets are in.  We talked about
 
     construction of the two different cathode sandwiches by the
 
     construction of the two different cathode sandwiches by the
 
     end of this year.  Brian thinks that this is possible (but
 
     end of this year.  Brian thinks that this is possible (but

Latest revision as of 11:57, 11 April 2007

FDC Weekly Meeting

Date: October 18, 2006

Participants: Daniel, Brian, Simon

Next Meeting: Wednesday, October 25, 2006 @ 1:30 p.m.


Manpower

   Chris Cuevas has arranged for someone in the Accelerator Group
   to do the circuit board design for the FDC wire planes.  Chris
   will act as the coordinator.

Mechanical Drawings

   The FDC mechanical drawings from Brian are nearing completion.
   They should be ready by the end of next week.  This will include
   instructions for the CAD layout.

Copper Thickness

   The small-scale prototype cathodes have a Cu thickness of 1/7 oz.
   Simon will check with Fernando and Gerard if this is expected to
   be a problem.

Rohacell

   The 49 in x 49 in Rohacell sheets are in.  We talked about
   construction of the two different cathode sandwiches by the
   end of this year.  Brian thinks that this is possible (but
   tight).  This should include some way to measure their flatness.
   We want to make a design decision by the end of this year.

Minutes prepared by Daniel. Send any comments or corrections along.