Difference between revisions of "Minutes-9-25-2014"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
September 18, 2014 FDC+CDC meeting
+
September 25, 2014 FDC+CDC meeting
  
 
= Connection =
 
= Connection =
Line 26: Line 26:
 
== DAQ ==
 
== DAQ ==
  
- Beni: CDC+FDC DAQ modules have been moved to the top trigger crate where the GTP is. Sasha is ready with the BCAL trigger, but there's more work to be able to read the CDC+FDC+BCAL. The plan is to use again scintillator trigger over the weekend without moving the trigger modules back to the bottom crate. Beni is working  
+
- Beni: CDC+FDC DAQ modules have been moved to the top trigger crate where the GTP is. Sasha is ready with the BCAL trigger, but there's more work to be able to read the CDC+FDC+BCAL. The plan is to use again scintillator trigger over the weekend without moving the trigger modules back to the bottom crate. Beni is working on interface between the data base parameters and the Sasha's initialization files.
 +
 
 +
- Lubomir looked at the runs with mode 8, where you have both raw and processed data. In the figures linked above we compare the processed data with the one obtained from raw data, by simulating the firmware offline.
 
   
 
   
 
== CDC update ==
 
== CDC update ==

Revision as of 16:50, 26 September 2014

September 25, 2014 FDC+CDC meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. FDC meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. DAQ (Beni)
  2. CDC update (Mike)
  3. FDC update (Vlad, Lubomir)
  4. Electronics (Fernando)
  5. Engineering
  6. Commissioning Wiki Page (all)
  7. Other