Difference between revisions of "Minutes-9-20-2012"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
# Engineering (Bill)
 
# Engineering (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
+
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni, Lubomir)
 
# [http://www.jlab.org/Hall-D/detector/fdc/general/tdr.pdf TDR, pages 132-143] (Lubomir)
 
# [http://www.jlab.org/Hall-D/detector/fdc/general/tdr.pdf TDR, pages 132-143] (Lubomir)
 
# Other
 
# Other

Revision as of 18:17, 19 September 2012

September 20, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Cathode corrosion
    • Cathode protection tests
    • Recent SEM results [1], [2], [3], [4]
  3. Engineering (Bill)
  4. Electronics (Chris, Nick)
  5. Third package tests FDC E-log (Beni, Lubomir)
  6. TDR, pages 132-143 (Lubomir)
  7. Other