Difference between revisions of "Minutes-9-20-2012"
From GlueXWiki
Line 8: | Line 8: | ||
# Engineering (Bill) | # Engineering (Bill) | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
− | # Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | + | # Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni, Lubomir) |
# [http://www.jlab.org/Hall-D/detector/fdc/general/tdr.pdf TDR, pages 132-143] (Lubomir) | # [http://www.jlab.org/Hall-D/detector/fdc/general/tdr.pdf TDR, pages 132-143] (Lubomir) | ||
# Other | # Other |
Revision as of 18:17, 19 September 2012
September 20, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Cathode corrosion
- Engineering (Bill)
- Electronics (Chris, Nick)
- Third package tests FDC E-log (Beni, Lubomir)
- TDR, pages 132-143 (Lubomir)
- Other