Difference between revisions of "Minutes-9-19-2013"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
# Tests in EEL126
 
# Tests in EEL126
 
#* New F1TDC (Beni)
 
#* New F1TDC (Beni)
#* Thick cell analysis (Vlad) [http://www.jlab.org/Hall-D/detector/fdc/clucou/WS_signals.pdf]
+
#* Thick cell analysis (Vlad) [http://www.jlab.org/Hall-D/detector/fdc/clucou/WS_signals.pdf],[http://www.jlab.org/Hall-D/detector/fdc/clucou/Several_Tracks.pdf]
 
# Other
 
# Other
  

Revision as of 18:45, 18 September 2013

September 19, 2013 FDC meeting

Agenda

  1. Installation preparations [1] (all)
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Tests in EEL126
    • New F1TDC (Beni)
    • Thick cell analysis (Vlad) [2],[3]
  5. Other