Difference between revisions of "Minutes-8-29-2013"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
= Agenda =
 
= Agenda =
 
# Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf]
 
# Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf]
# Engineering  (Bill)
+
# Engineering [http://www.jlab.org/Hall-D/detector/fdc/drawings/mesh_support1.PNG],[http://www.jlab.org/Hall-D/detector/fdc/drawings/mesh_support2.PNG],[http://www.jlab.org/Hall-D/detector/fdc/drawings/mesh_support3.PNG],[http://www.jlab.org/Hall-D/detector/fdc/drawings/mesh_support4.PNG] (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Tests at EEL126  
 
# Tests at EEL126  

Revision as of 12:10, 29 August 2013

August 29, 2013 FDC meeting

Agenda

  1. Installation preparations [1]
  2. Engineering [2],[3],[4],[5] (Bill)
  3. Electronics (Chris, Nick)
  4. Tests at EEL126
    • Diffusion measurements [6] (Vlad)
  5. Other