Line 30: Line 30:
 
== Engineering ==
 
== Engineering ==
  
- Cathode foils: Roger communicated with Advanced Circuits and expects today an estimate. Then he will return to the procurement the forms and the information they requested for the  
+
- Cathode foils: Roger communicated with Advanced Circuits and expects today an estimate. Then he will return to the procurement the forms and the information they requested. If Advanced Circuits can provide an offer, then it will no longer be a sole source procurement. If not, it will be used as an argument for the sole source procurement.
 +
 
 +
- A Rohacell ring was glued to test the procedure and the new templates and will be used for the first new design prototype. It will be laminated to the first article g10 ring (Bill expects it at the beginning of October, maybe earlier). 
 
   
 
   
 
- no news about the wire stringing design; Bill is busy with other things.
 
- no news about the wire stringing design; Bill is busy with other things.

Revision as of 18:05, 26 August 2010

August 26, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics: update (Fernando)
  3. Engineering
    • Cathode foil: sole source procurement status (Roger)
    • Other: rohacell gluing, cathode grounding, update from UVA
  4. Full-scale prototype tests: update (Beni)
  5. Other