Difference between revisions of "Minutes-8-23-2012"
From GlueXWiki
Line 19: | Line 19: | ||
= Minutes = | = Minutes = | ||
− | Participants: | + | Participants: Fernando, Tim, Eugene, Dave, Simon, Vlad, and Lubomir |
− | == | + | == Production == |
− | - Dave: working on | + | - Dave: working on 10 new cathodes to be used in the first package, not in the second package as we always stated before. Again The bottleneck is the card gluing |
== Cathode corrosion == | == Cathode corrosion == |
Revision as of 15:04, 23 August 2012
August 23, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Cathodes
- Third package
- Cathode corrosion
- Results from SEM analyses: [1]
- Test chambers
- Engineering (Dave)
- Cathode strong-backs
- Electronics (Chris, Nick)
- PCBs
- TDR, pages 132-145 (Lubomir)
- Other