Difference between revisions of "Minutes-8-23-2012"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
= Minutes =
 
= Minutes =
  
Participants: Eugene, Bill, Dave, Simon, Vlad, Beni, and Lubomir
+
Participants: Fernando, Tim, Eugene, Dave, Simon, Vlad, and Lubomir
  
== Cathode production ==
+
== Production ==
  
- Dave: working on 8 new cathodes to be used in the second package. The bottleneck is the card gluing since we have not decided if we want to change the procedures.
+
- Dave: working on 10 new cathodes to be used in the first package, not in the second package as we always stated before. Again The bottleneck is the card gluing  
  
 
== Cathode corrosion ==
 
== Cathode corrosion ==

Revision as of 15:04, 23 August 2012

August 23, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Cathodes
    • Third package
  2. Cathode corrosion
    • Results from SEM analyses: [1]
    • Test chambers
  3. Engineering (Dave)
    • Cathode strong-backs
  4. Electronics (Chris, Nick)
    • PCBs
  5. TDR, pages 132-145 (Lubomir)
  6. Other