Difference between revisions of "Minutes-8-18-2011"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
#* HV cap problem: [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823448624.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823470741.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823479007.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823508786.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_1.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_3.bmp]
 
#* HV cap problem: [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823448624.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823470741.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823479007.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823508786.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_1.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_3.bmp]
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Wire deadening:  
+
#* Wire deadening: [http://www.jlab.org/Hall-D/detector/fdc/images/edge-Cu-wire_1000x_3.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/edge-Cu-wire_1000x_4_near_end.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/edge-Cu-wire_1500x_5-3d-3.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/EDGE_WIRE-SHORTESTS-Cu-_1500x_6-3d-3p.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/AT_END-Cu-wire3_1000x_1.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/TOWARD_CENTER-Cu-wire_3-LONGEST_WIRE_1000x_2.jpg]
 
#* Gusset ring
 
#* Gusset ring
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 10:41, 19 August 2011

August 18, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Engineering (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
    • Status of cell#2
    • Deadened area tests
  5. Other