Difference between revisions of "Minutes-8-18-2011"
From GlueXWiki
Line 7: | Line 7: | ||
#* HV cap problem: [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823448624.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823470741.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823479007.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823508786.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_1.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_3.bmp] | #* HV cap problem: [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823448624.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823470741.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823479007.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823508786.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_1.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_3.bmp] | ||
# Engineering (Bill) | # Engineering (Bill) | ||
− | #* Wire deadening: | + | #* Wire deadening: [http://www.jlab.org/Hall-D/detector/fdc/images/edge-Cu-wire_1000x_3.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/edge-Cu-wire_1000x_4_near_end.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/edge-Cu-wire_1500x_5-3d-3.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/EDGE_WIRE-SHORTESTS-Cu-_1500x_6-3d-3p.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/AT_END-Cu-wire3_1000x_1.jpg], [http://www.jlab.org/Hall-D/detector/fdc/images/TOWARD_CENTER-Cu-wire_3-LONGEST_WIRE_1000x_2.jpg] |
#* Gusset ring | #* Gusset ring | ||
# Electronics update (Chris) | # Electronics update (Chris) |
Revision as of 10:41, 19 August 2011
August 18, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Engineering (Bill)
- Electronics update (Chris)
- Chamber testing at EEL126 (Beni)
- Status of cell#2
- Deadened area tests
- Other