Difference between revisions of "Minutes-8-18-2011"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_18_2011.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_18_2011.xlsx Construction Tracking] (Dave)
 
#* Status
 
#* Status
#* Other: wire deadening, HV cap testing [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp],  
+
#* HV cap problem: [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823448624.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823470741.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823479007.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295823508786.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_1.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/cap_72_W008_3.bmp]
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Update
+
#* Wire deadening:
 
#* Gusset ring
 
#* Gusset ring
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 10:28, 19 August 2011

August 18, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Engineering (Bill)
    • Wire deadening:
    • Gusset ring
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
    • Status of cell#2
    • Deadened area tests
  5. Other