Difference between revisions of "Minutes-8-18-2011"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_18_2011.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_18_2011.xlsx Construction Tracking] (Dave)
 
#* Status
 
#* Status
#* Other: wire deadening, HV cap testing
+
#* Other: wire deadening, HV cap testing [http://www.jlab.org/Hall-D/detector/fdc/images/1295817429522.bmp], [http://www.jlab.org/Hall-D/detector/fdc/images/1295817479405.bmp],
 
# Engineering (Bill)
 
# Engineering (Bill)
 
#* Update
 
#* Update

Revision as of 10:25, 19 August 2011

August 18, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Other: wire deadening, HV cap testing [1], [2],
  2. Engineering (Bill)
    • Update
    • Gusset ring
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
    • Status of cell#2
    • Deadened area tests
  5. Other