Difference between revisions of "Minutes-8-18-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 3: Line 3:
 
= Agenda =
 
= Agenda =
  
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_11_2011.xlsx Construction Tracking] (Dave)
+
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_August_18_2011.xlsx Construction Tracking] (Dave)
 
#* Status
 
#* Status
 
#* Other: wire deadening, HV cap testing
 
#* Other: wire deadening, HV cap testing
Line 19: Line 19:
 
= Minutes =
 
= Minutes =
  
Participants: Bill, Dave, Chris, Beni, Simon, Glenn, and Lubomir.
+
Participants: Bill, Dave, Beni, Simon, and Lubomir.
  
 
== Production ==
 
== Production ==

Revision as of 15:59, 18 August 2011

August 18, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Other: wire deadening, HV cap testing
  2. Engineering (Bill)
    • Update
    • Gusset ring
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
    • Status of cell#2
    • Deadened area tests
  5. Other