Difference between revisions of "Minutes-8-16-2012"
From GlueXWiki
Line 21: | Line 21: | ||
= Minutes = | = Minutes = | ||
− | Participants: Bill, Dave, | + | Participants: Eugene, Bill, Dave, Simon, Vlad, Beni, and Lubomir |
+ | == | ||
== Cathode corrosion == | == Cathode corrosion == |
Revision as of 10:29, 17 August 2012
August 16, 2012 FDC meeting
Agenda
- Cathode production Construction Tracking (Dave)
- Cathode corrosion
- Status [1]
- Possible procedure changes
- Conductive tape technology
- Test results [2], ball counting hist.#1, ball counting hist.#2, ball counting hist.#3, ball counting hist.#4, ball counting hist.#5, ball counting hist.#6
- Procedure changes
- Engineering (Bill)
- Cathode strong-back
- Other: epoxy tests
- Electronics (Chris, Nick)
- PCBs
- TDR, pages 132-145 (Lubomir)
- Other