Minutes-8-11-2011

From GlueXWiki
Revision as of 18:12, 12 August 2011 by Pentchev (Talk | contribs)

Jump to: navigation, search

August 11, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
    • Other: Humi-seal, silver epoxy overheating
  2. Engineering (Bill)
    • Update
    • Package flatness
  3. Electronics (Chris)
    • Update
    • Pre-amp card connectors
  4. Chamber testing at EEL126
    • Cell#2 status
  5. Other