Difference between revisions of "Minutes-8-11-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 12: Line 12:
 
# Electronics (Chris)
 
# Electronics (Chris)
 
#* Update
 
#* Update
#* Daughter card connectors
+
#* Pre-amp card connectors
 
# Chamber testing at EEL126
 
# Chamber testing at EEL126
 
#* Cell#2 status  
 
#* Cell#2 status  

Revision as of 18:06, 10 August 2011

August 4, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
    • Other: Humi-seal, silver epoxy overheating
  2. Engineering (Bill)
    • Update
    • Package flatness
  3. Electronics (Chris)
    • Update
    • Pre-amp card connectors
  4. Chamber testing at EEL126
    • Cell#2 status
  5. Other