Difference between revisions of "Minutes-7-5-2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 9: Line 9:
 
#* Cooling system [http://www.jlab.org/Hall-D/detector/fdc/general/cooling.pdf Example of water cooling]
 
#* Cooling system [http://www.jlab.org/Hall-D/detector/fdc/general/cooling.pdf Example of water cooling]
 
# Electronics update (Chris)
 
# Electronics update (Chris)
# [http://www.jlab.org/Hall-D/detector/fdc/documents/LV_cable_assignment.pdf LV cable assignment] (Vlad)
+
# [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_LV_cable_assignment.pdf LV cable assignment] (Vlad)
 
# Test set-up in 126 (Beni)
 
# Test set-up in 126 (Beni)
 
# Other
 
# Other

Revision as of 10:02, 5 July 2012

July 5, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production status
    • Fourth package tests
    • Refurbishment preparations
  2. Engineering update
  3. Electronics update (Chris)
  4. LV cable assignment (Vlad)
  5. Test set-up in 126 (Beni)
  6. Other