Difference between revisions of "Minutes-7-19-2012"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* Third package preparation
 
#* Third package preparation
 
#* Grounding scheme (Vlad)
 
#* Grounding scheme (Vlad)
# Engineering (Bill)
+
# Engineering [http://www.jlab.org/Hall-D/detector/fdc/drawings/spacer_ring_picture1.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/schematic.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/latest_chiller_view.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/ spacer_ring_cross_section.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/spacer_ring_picture2.png] (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Gas system (Beni, Bill)
 
# Gas system (Beni, Bill)

Revision as of 11:54, 19 July 2012

July 19, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Fourth package status and spare wire frames (Lubomir, Vlad)
    • Third package preparation
    • Grounding scheme (Vlad)
  2. Engineering [1], [2], [3], spacer_ring_cross_section.png, [4] (Bill)
  3. Electronics (Chris, Nick)
  4. Gas system (Beni, Bill)
  5. Test set-up in 126 (Beni)
  6. Other