Difference between revisions of "Minutes-7-19-2012"
From GlueXWiki
Line 6: | Line 6: | ||
#* Third package preparation | #* Third package preparation | ||
#* Grounding scheme (Vlad) | #* Grounding scheme (Vlad) | ||
− | # Engineering (Bill) | + | # Engineering [http://www.jlab.org/Hall-D/detector/fdc/drawings/spacer_ring_picture1.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/schematic.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/latest_chiller_view.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/ spacer_ring_cross_section.png], [http://www.jlab.org/Hall-D/detector/fdc/drawings/spacer_ring_picture2.png] (Bill) |
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Gas system (Beni, Bill) | # Gas system (Beni, Bill) |
Revision as of 11:54, 19 July 2012
July 19, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Fourth package status and spare wire frames (Lubomir, Vlad)
- Third package preparation
- Grounding scheme (Vlad)
- Engineering [1], [2], [3], spacer_ring_cross_section.png, [4] (Bill)
- Electronics (Chris, Nick)
- Gas system (Beni, Bill)
- Pipe outgassing, gas detector aiging
- Gas mixture (Lubomir)
- Test set-up in 126 (Beni)
- Other