Minutes-7-18-2013

From GlueXWiki
Revision as of 18:17, 17 July 2013 by Pentchev (Talk | contribs) (Agenda)

Jump to: navigation, search

July 11, 2013 FDC meeting

Agenda

  1. Production
    • Final package assembly [1], [2], [3] (Bill, Dave)
  2. Engineering (Bill)
    • Survey
    • Connector strain relief
  3. Electronics (Chris, Nick)
  4. Full electronics test FDC E-log (Lubomir, Vlad)
  5. Other