Difference between revisions of "Minutes-7-18-2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 6: Line 6:
 
# Engineering (Bill)
 
# Engineering (Bill)
 
#* Survey
 
#* Survey
#* Connector strain relief  
+
#* Connector strain relief [http://www.jlab.org/Hall-D/detector/fdc/drawings/SKIN.PNG], [http://www.jlab.org/Hall-D/detector/fdc/drawings/CLOSEUP.PNG],[http://www.jlab.org/Hall-D/detector/fdc/drawings/ENDVIEW.PNG]
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Full electronics test [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Lubomir, Vlad)
 
# Full electronics test [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Lubomir, Vlad)

Revision as of 11:17, 18 July 2013

July 11, 2013 FDC meeting

Agenda

  1. Production
    • Final package assembly [1], [2], [3] (Bill, Dave)
  2. Engineering (Bill)
    • Survey
    • Connector strain relief [4], [5],[6]
  3. Electronics (Chris, Nick)
  4. Full electronics test FDC E-log (Lubomir, Vlad)
  5. Other