Minutes-7-12-2012

From GlueXWiki
Revision as of 17:40, 11 July 2012 by Pentchev (Talk | contribs)

Jump to: navigation, search

July 12, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Fourth package tests
    • Spare wire frames
    • First package refurbishment
    • Third package preparation
  2. Engineering update (Bill)
    • Cooling system
  3. Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
  4. Gas system status (Beni)
  5. Test set-up in 126 (Beni)
  6. Other