= Minutes = | = Minutes = | ||
− | Participants: Bill, Dave, Chris, Nick | + | Participants: Bill, Dave, Chris, Nick, Vlad, Beni, and Lubomir. |
== Production == | == Production == | ||
− | - Dave: | + | - Dave: Casey working on the last wire frame |
- Third package was removed from the assembly fixture and put aside on a table. For that all the metal pins had to be removed, then the package was turned upside down to insert the new pins and hubs. We connected the package to the gas to check the tightness: it was as good as it before this operation. | - Third package was removed from the assembly fixture and put aside on a table. For that all the metal pins had to be removed, then the package was turned upside down to insert the new pins and hubs. We connected the package to the gas to check the tightness: it was as good as it before this operation. |
Revision as of 17:26, 7 June 2012
June 7, 2012 FDC meeting
Agenda
- Swiss schnaps (Beni)
- Production Construction Tracking (Dave)
- Production status
- Fourth package tests (Vlad)
- Engineering update (Bill)
- Electronics update (Chris)
- Gas system (Beni)
- Test set-up in 126 FDC E-log (Beni)
- Other