Difference between revisions of "Minutes-6-7-2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 16: Line 16:
 
= Minutes =
 
= Minutes =
  
Participants: Bill, Dave, Chris, Nick, Mark, Vlad, Beni, and Lubomir.   
+
Participants: Bill, Dave, Chris, Nick, Vlad, Beni, and Lubomir.   
 
    
 
    
 
== Production ==
 
== Production ==
  
- Dave: wire plane #27 remains to be deadened, after tension measurements on #28 will be removed from the stringing table and will string the very last wire frame #8. Chris will put components on #28 next week. Cathode #53 (type-2) had a problem with gluing the ground plane: the Mylar pilled out from the frame. This is the first frame that was converted from type-1 to type-2 by filling the groove with epoxy, so most likely the surface that was epoxied and sanded was too smooth. Casey roughened it and a new foil was tensioned on it today; tomorrow we will know the result.
+
- Dave: Casey working on the last wire frame
  
 
- Third package was removed from the assembly fixture and put aside on a table. For that all the metal pins had to be removed, then the package was turned upside down to insert the new pins and hubs. We connected the package to the gas to check the tightness: it was as good as it before this operation.  
 
- Third package was removed from the assembly fixture and put aside on a table. For that all the metal pins had to be removed, then the package was turned upside down to insert the new pins and hubs. We connected the package to the gas to check the tightness: it was as good as it before this operation.  

Revision as of 17:26, 7 June 2012

June 7, 2012 FDC meeting

Agenda

  1. Swiss schnaps (Beni)
  2. Production Construction Tracking (Dave)
    • Production status
    • Fourth package tests (Vlad)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Gas system (Beni)
  6. Test set-up in 126 FDC E-log (Beni)
  7. Other