Minutes-6-28-2012

From GlueXWiki
Revision as of 18:06, 28 June 2012 by Pentchev (Talk | contribs)

Jump to: navigation, search

June 28, 2012 FDC meeting

Agenda

  1. FDC installation and cable routing (Tom Carstens)
  2. Production Construction Tracking (Dave)
    • Production status
    • Other: package transportation, subsystem installations
  3. Engineering update
    • Cooling system
  4. Electronics update (Chris)
  5. Cable assignment (Vlad)
  6. Gas system (Beni)
  7. Test set-up in 126 (Beni)
    • Cathode tests of the first package (Vlad)
  8. Other